Wirsbo® HePex hydronic tubing awaiting concrete pour.
Bea Day Plumbers, Inc.
 
Clockwise from left: Preliminary manifold system for pressure-testing tubing before and during concrete pour. Electric water heater used as a boiler for the hydronic system. After concrete pour and wall construction, the completed manifold system beneath the boiler.

Close Window